HP rp2450 Manual Page 91

  • Download
  • Add to my manuals
  • Print
  • Page
    / 202
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 90
Chapter
Cabinet Mounted Server Unpack
99
Cabinet Mounted Server Unpack
Overview
rp24xx servers can be procured in two modes: stand-alone or pre-installed in a cabinet at the
Hewlett-Packard factory. Stand-alone servers can be installed in an existing HP-supported cabinet by
purchasing Rail Kit A5810A.
Installing a Factory-integrated Cabinet
Unpacking the Cabinet
NOTE It is the customer's responsibility to inspect the shipping package for damage.
It is the Hewlett-Packard Customer Engineer’s responsibility to remove the cabinet assembly
from the shipping pallet.
WARNING A fully configured 2.0 meter cabinet can weigh over 500 kg (1100 lbs). Be careful not
to tip the cabinet while unpacking.
Failure to heed this warning can result in serious injury or death and equipment
damage.
To unpack the cabinet, perform the following steps:
WARNING Wear protective glasses while cutting the plastic bands around the shipping
container. These bands are under tension.
Failure to heed this warning can result in serious eye injury if the severed bands
snap back and hit you in the face.
Step 1. Cut the plastic polystrap bands around the shipping container.
Step 2. Follow the procedure listed below to prepare the cabinet for removal from the pallet:
a. Lift the cardboard top cap off of the shipping box (callout 1).
b. Remove the packing material underneath the cap (callout 2).
c. Remove the clamshell box and place out of the way.
d. Remove the screws that secure the ramps in place and lift the ramps out (callout 3).
Page view 90
1 2 ... 86 87 88 89 90 91 92 93 94 95 96 ... 201 202

Comments to this Manuals

No comments