HP AA-RS2JA-TE User Manual Page 149

  • Download
  • Add to my manuals
  • Print
  • Page
    / 360
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 148
edge switch 2/16 service manual 2–87
Diagnostics
5. Select (highlight) the new zone name and drag (holding the left mouse button)
the name to the Zones in Set list.
6. At the Zones in Set list, select (highlight) the zone name to be deleted, then
drag (holding the left mouse button) the name off the Modify Zone Set dialog
box.
7. At the Modify Zone Set dialog box, click Save Zone Set. The zone set (with
the new zone name) is saved and the dialog box closes.
8. At the Zone Sets dialog box, select (highlight) the active zone set name, then
select Activate from the Actions icon on the dialog box. The Activate Zone Set
dialog box displays.
9. Click Start. The status message changes to Activate zone set complete. Click
Close to close the dialog box.
10.Click Close to close the Zone Sets dialog box and return to the Zoning Set tab
view with the modified active zone set.
Did the zone name change solve the problem and did both switches join through the
ISL to form a fabric?
NO YES
The switches, associated ISL, and multi-switch fabric appear operational.
Contact the next level of support.
14
The switch E_Port segmented because a build fabric protocol error was detected.
a. Disconnect the fiber-optic jumper cable from the segmented E_Port.
b. Reconnect the cable to the same port.
Did reconnecting the cable solve the problem and did both switches join through the
ISL to form a fabric?
NO YES
The switches, associated ISL, and multi-switch fabric appear operational.
15
Initial program load (IPL) the switch (Reset or IPL the Switch on page -35).
Did the IPL solve the problem and did both switches join through the ISL to form a
fabric?
NO YES
Page view 148
1 2 ... 144 145 146 147 148 149 150 151 152 153 154 ... 359 360

Comments to this Manuals

No comments