Operations 20
a.
Remove the screws securing the FlexibleLOM riser cage.
b. Lift the cage.
Install the FlexibleLOM riser cage
1. Install the FlexibleLOM riser cage.
2. Install the server into the chassis ("Installing the server into the chassis" on page 25).
3. Power up the server (on page 15).
Comments to this Manuals