Hardware options installation 49
o
Left node
o Right node
11. Install the FBWC capacitor pack holder.
12. Install the drive air baffle (on page 17).
13. Install the server into the chassis ("Installing the server into the chassis" on page 25).
14. Power up the server (on page 15).
Installing an SFF quick-release drive cage
1. Power down the server (on page 15).
2. Remove the server from the chassis (on page 15).
3. Remove the drive air baffle (on page 16).
4. Remove the LFF quick-release drive cage.
5. Align the keyed slots in the drive cage with the guide pins on the server.
Comments to this Manuals