Operations 19
b.
Lift the cage to unseat the riser board.
Install the PCI riser cage
1. Install the PCI riser cage.
2. Install the server into the chassis ("Installing the server into the chassis" on page 25).
3. Power up the server (on page 15).
Remove the FlexibleLOM riser cage
1. Power down the server (on page 15).
2. Disconnect all peripheral cables from the server.
3. Remove the server from the chassis (on page 15).
4. Remove the FlexibleLOM riser cage:
Comments to this Manuals