Corrective actionCurrent status
3. Make sure that all the pairs belonging to the journal in the primary site
are released.
4. Create a Cnt Ac-J delta resync pair that extends from the primary site to
the Cnt Ac-J secondary site.
Primary site: PSUE or PSUS 1. Release the Cnt Ac-J pair from the primary site.
Cnt Ac-J secondary site: HOLD
2. Make sure that all the pairs belonging to the journal in the primary site
are released.
3. Create a Cnt Ac-J delta resync pair that extends from the primary site to
the Cnt Ac-J secondary site.
Change the status of the HLDE pair back to HOLD using pairresync.Primary site: HLDE
Cnt Ac-J secondary site: HOLD
Primary site: SMPL 1. Release the pair in HOLD status from the Cnt Ac-J secondary site.
Cnt Ac-J secondary site: HOLD
2. Create a Cnt Ac-J delta resync pair that extends from the primary site to
the Cnt Ac-J secondary site.
Recovery in a 2DC configuration
Host operations are transferred to the Continuous Access Journal S-VOL in the remote site when a
disaster or failure occurs in the primary site in a 2DC configuration. Failures are corrected at the
primary site, host operations are transferred back, and the 2DC configuration is reestablished.
See “2 Data center configuration (page 151) for information and illustrations on the configuration
covered in this procedure.
To recover a 2DC configuration failure
1. In the remote site, confirm the consistency of the Cnt Ac-J S-VOL.
2. In the intermediate site, release the Cnt Ac-S pair using the Pairsplit-S command.
3. In the intermediate and remote sites, release the Cnt Ac-J pair using the Pairsplit-S command.
4. Confirm that the Cnt Ac-J S-VOL has changed to SMPL status.
5. Resume host operations to the Cnt Ac-J S-VOL on the remote site.
NOTE: Be aware of the following:
The 2DC configuration does not allow host operations on the intermediate site.
If the intermediate site is not connected to a host, use the remote command device for
Cnt Ac-J and Cnt Ac-S pair operations.
6. On the primary site, if Cnt Ac-S pairs exist, release them.
7. On the remote Cnt Ac-J site, create a Cnt Ac-S pair:
Use the Cnt Ac-J S-VOL on the remote site as the Cnt Ac-S P-VOL. This is the current disaster
recovery production volume.
Use the primary site volume as the Cnt Ac-S S-VOL
Follow all requirements for creating a Cnt Ac-S pair.
8. After the new Cnt Ac-S pair is in PAIR status, stop host operations at the remote site, then
release the Cnt Ac-S pair.
9. On the intermediate site, create a Cnt Ac-J pair to the Cnt Ac-J remote site, with no data
copying (specify None on the Copy Mode option). Specify the intermediate site volume as
the Cnt Ac-J P-VOL and the remote volume as the Cnt Ac-J S-VOL.
Recovery for 3 Cnt Ac-J/Cnt Ac-S data centers and 3 Cnt Ac-J data centers 101