Hp ProLiant ML350 G6 Server User Manual Page 86

  • Download
  • Add to my manuals
  • Print
  • Page
    / 144
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 85
Hardware options installation 86
o
Extend the server from the rack (on page 24).
4. Locate the TPM connector ("System board components" on page 11).
CAUTION:
Any attempt to remove an installed TPM from the system board breaks or disfigures
the TPM security rivet. Upon locating a broken or disfigured rivet on an installed TPM,
administrators should consider the system compromised and take appropriate measures to ensure
the integrity of the system data.
5. Install the TPM board. Press down on the connector to seat the board ("System board components" on
page 11).
6. Install the TPM security rivet by pressing the rivet firmly into the system board.
7. Install the access panel (on page 27).
8. Do one of the following:
o Close or install the tower bezel, as needed.
o Slide the server back into the rack.
9. Power up the server (on page 24).
Page view 85
1 2 ... 81 82 83 84 85 86 87 88 89 90 91 ... 143 144

Comments to this Manuals

No comments