Hp Array Controller HSG V8.7 Software User Manual Page 223

  • Download
  • Add to my manuals
  • Print
  • Page
    / 576
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 222
Replacement Procedures 527
Replacing the External Cache Battery Storage
Building Block
The ECB SBB can be replaced with cabinet power on or off. A single-
battery ECB SBB is shown in Figure 53 and a dual-battery ECB SBB
is shown in Figure 54.
Figure 53 Single-Battery ECB SSB Configuration
Figure 54 Dual-battery ECB SBB Configuration
1 Battery disable switch
2 Status LED
3 ECB Y cable
1 Battery disable switch
2 Status LED
3 ECB Y cable
4 Faceplate and controls for second battery
CXO5715A
CACHE
POWER
STATUS
SHUT OFF
1
3
~
2
CXO5713A
CACHE
POWER
STATUS
SHUT OFF
CACHE
POWER
STATUS
SHUT OFF
3
~
4
2
1
Page view 222
1 2 ... 218 219 220 221 222 223 224 225 226 227 228 ... 575 576

Comments to this Manuals

No comments