HP AdvanceStack 10BT Switching Hubs Installation Guide
The Switching Hubs are a family of multiport repeaters. With these hubs you can connect computers,
printers, and servers together to exchange files. This guide shows you how to install your Switching
Hub. The three models of the Switching Hubs are:
This installation guide describes how to:
1. Verify included parts.
2. Install any optional modules.
3. Mount the hub.
4. Connect the hubs together with Extender Cables.
5. Verify that the hub operates correctly.
6. Connect network cables using RJ-45 and telco connectors.
Throughout the manuals, these hubs will be abbreviated as the Hub-12R, Hub-24R, and Hub-24T.
HP J3202A Switching Hub-24R
HP J3204A Switching Hub-24T
HP J3200A Switching Hub-12R
0_INSTAL.FM5 Page 1 Friday, August 9, 1996 4:28 PM
Page view 0
1 2 3 4 5 6 ... 15 16

Summary of Contents

Page 1

1HP AdvanceStack 10BT Switching Hubs Installation GuideThe Switching Hubs are a family of multiport repeaters. With these hubs you can connect com

Page 2 - Verify Included Parts

10 HP AdvanceStack 10BT Switching Hubs Installation GuideConnecting Network CablesUsing RJ-45 ConnectorsIf the Port LED is not on, use this table t

Page 3 - Install Any Optional Modules

11HP AdvanceStack 10BT Switching Hubs Installation GuideUsing Telco Connectors with the Hub-24TIf you prefer to make your twisted-pair connections

Page 4 - Mount the Hub

12 HP AdvanceStack 10BT Switching Hubs Installation GuideTo use a telco connector:To remove a telco connector, reverse this process.AUI/Xcvr SlotAn

Page 5 - Upper hole in the bracket

13HP AdvanceStack 10BT Switching Hubs Installation Guidemust be disabled on the transceiver. Cable ManagementThe HP Switching Hubs have been desig

Page 6 - Install additional screw

14 HP AdvanceStack 10BT Switching Hubs Installation GuideWhere to Go From HereYour hub is now correctly installed and is able to send and receives

Page 7 - Mounting the Hub on a Wall

0_INSTAL.FM5 Page 15 Friday, August 9, 1996 4:28 PM

Page 8 - Longer Cables Option

© 1996 Hewlett-Packard CompanyHP Part Number: 5964-4661Edition 1, August 1996Printed in Singapore.*5964-4661* Technical information in this document i

Page 9

2 HP AdvanceStack 10BT Switching Hubs Installation GuideVerify Included PartsEach of the three HP Switching Hubs has the following components shipp

Page 10 - Connecting Network Cables

3HP AdvanceStack 10BT Switching Hubs Installation GuideInstall Any Optional ModulesInstall optional modules into the Management Slot or the Expans

Page 11

4 HP AdvanceStack 10BT Switching Hubs Installation GuideMount the HubAfter the modules are inserted, you are ready to put the hub in a stable locat

Page 12 - AUI/Xcvr Slot

5HP AdvanceStack 10BT Switching Hubs Installation Guide2. Partially install a screw (5/8-inch number 12-24) into the top hole of a pair of holes 0

Page 13 - Cable Management

6 HP AdvanceStack 10BT Switching Hubs Installation Guide4. Install the other number 12-24 screw into the upper hole in each bracket. Tighten these

Page 14 - Where to Go From Here

7HP AdvanceStack 10BT Switching Hubs Installation GuideMounting the Hub on a WallYou can put one hub on a wall or stack two hubs together on a wal

Page 15

8 HP AdvanceStack 10BT Switching Hubs Installation GuideConnecting the Switching Hubs Together with Extender CableAttach the included Extender Cabl

Page 16 - *5964-4661*

9HP AdvanceStack 10BT Switching Hubs Installation Guide2. If you are not using an RPS, plug the included power cord into the hub’s power cord rece