2. Connect the power cord to the power supply and engage the cord lock.
Figure 45 Installing a power supply
Verifying proper operation
After replacing the power supply or blower, check the following to verify that the component is operating
properly:
NOTE:
It may take up to 10 minutes for the component to display good status.
• Make sure the blower begins o perating immediately.
• The status indicator should be on.
• From HP Command View EVA:
• N avigate back to the component and check the status. It should be
.
• TurnoffthelocatefunctionbyclickingLocate > Locate Off.
Returning the failed component
Follow the return instructions provided with the new component.
HP StorageWorks 3000/5000 Enterprise Virtual Array user guide (VCS 4.xxx)
99
Comments to this Manuals