Hp ProLiant ML10 Server User Manual Page 42

  • Download
  • Add to my manuals
  • Print
  • Page
    / 76
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 41
Hardware options installation 42
8.
Install the expansion board. Verify that the board is firmly seated in the slot.
9. Connect all necessary internal cabling to the expansion board. For more information on these cabling
requirements, see the documentation that ships with the option.
10. Install the access panel (on page 14).
11. Return the server to an upright position.
12. Connect the power cord to the server.
13. Connect the power cord to the power source.
14. Press the Power On/Standby button.
The server exits standby mode and applies full power to the system. The system power LED changes
from amber to green.
Page view 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 75 76

Comments to this Manuals

No comments