Hp ProLiant ML10 Server User Manual Page 23

  • Download
  • Add to my manuals
  • Print
  • Page
    / 76
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 22
Hardware options installation 23
11.
Connect the other end of the SATA cable to the system board.
12. Fully insert the drive carrier into the media bay until the screw holes line up with the holes in the chassis,
and then secure the drive cage, using the two M3 screws from the option kit.
13. Install the front bezel (on page 14).
14. Install the access panel (on page 14).
15. Return the server to an upright position.
16. Connect the power cord to the server.
17. Connect the power cord to the power source.
18. Press the Power On/Standby button.
The server exits standby mode and applies full power to the system. The system power LED changes
from amber to green.
Page view 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 75 76

Comments to this Manuals

No comments