HP Data Center Environmental Edge Installation Manual Page 56

  • Download
  • Add to my manuals
  • Print
  • Page
    / 82
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 55
(Optional) Sensor Base Stations 56
o
RS-485 (-): Pin 4 (RJ-45 connector) to Pin 3 (RS-232 connector)
Callout Component Description
1
RJ-45 Ethernet connector Component of the Modbus adapter
2
RS-232 connector Component of the Modbus adapter
3
A/C power connector Connects to the power source
4
CAT5 Ethernet connector Connects to the network
5
Modbus adapter (RJ-45 to
RS-232)
Connects the RJ-45 connector to the RS-232 connector
6
RS-485 cable Connects the energy meter to the Modbus base station
5. Verify that the ION power meters are configured and meet all requirements.
6. After all hardware is installed, power up the components ("Power up procedure" on page 70).
Installation is complete.
Page view 55
1 2 ... 51 52 53 54 55 56 57 58 59 60 61 ... 81 82

Comments to this Manuals

No comments