(Optional) Sensor Base Stations 41
5.
To configure the Chilled Water Base Station, select Configuration.
The System Configuration window appears.
6. Select the Basic tab, and configure the following parameters:
o GeneralSelect the units for the display.
o TransducerSelect the type, mount, and frequency of the transducer.
o PipeSelect the material, diameter, and wall thickness of the pipe.
o LinerIf a liner is used, select the material and thickness.