Hp Array Controller HSG V8.7 Software User Manual Page 99

  • Download
  • Add to my manuals
  • Print
  • Page
    / 206
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 98
Power Verification and Addressing
UltraSCSI RAID Enclosure 4–13
2. If there are no expansion enclosures, go to step 3.
If there are expansion enclosures, press and hold the PVA standby
power switch (C
ALLOUT
1) on an expansion enclosure until the
master EMU initiates a power shut down on all enclosures.
3. Press and hold the PVA standby power switch (C
ALLOUT
1) on the
master enclosure until the master EMU initiates a power shut down
on the master enclosure.
4. Turn O
FF
all the ac input
boxes by pressing
O
on each
ac power switch
(C
ALLOUT
1) on any
expansion enclosure and
then the master enclosure.
Table 4–6 Removing a PVA (Continued)
CXO6303A
1
1
0
CXO5488B
2
1
Page view 98
1 2 ... 94 95 96 97 98 99 100 101 102 103 104 ... 205 206

Comments to this Manuals

No comments