Hp Array Controller HSG V8.7 Software User Manual Page 144

  • Download
  • Add to my manuals
  • Print
  • Page
    / 206
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 143
Power Distribution
6–18 UltraSCSI RAID Enclosure
4. Disconnect the ac power cord (C
ALLOUT
4) from the ac input box
(C
ALLOUT
1).
5. Loosen the two retaining screws (C
ALLOUT
2) and remove the ac
input box (C
ALLOUT
1).
6. Place the ac input box into an electrostatic bag.
Table 6–6 Installing an AC Input Box
1. Verify that the ac input box
being installed is a model
DS–BA35X–HE.
2. On the ac input box being
installed, press
O
on the ac
power switch (C
ALLOUT
1).
Table 6–5 Removing an AC Input Box (Continued)
1
0
1
0
1
2
3
4
CXO5186B
1
0
CXO5488B
2
1
Page view 143
1 2 ... 139 140 141 142 143 144 145 146 147 148 149 ... 205 206

Comments to this Manuals

No comments