Disaster Scenarios and Their Handling
Chapter 4 93
This scenario is an extension of
the previous failure scenario. In
the previous scenario, when the
package fails over to N2, it does
not start as the value of
RPO_TARGET would have been
exceeded.
To forcefully start the package
P1 on N2 when the FC links are
not restored on N2, check the
package log file on N2 and
execute the commands that
appear in it.
If the FC links are not
restored on N2, you can only
start the package forcefully.
You can forcefully start a
package only if it is
determined that the
associated data loss is
acceptable.
After you execute the force
start commands, package
P1 starts on N2 and runs
with md0 consisting of only
S2
(/dev/hpdev/mylink-sdf).
Complete the following procedure
to initiate a recovery:
1. Reconnect the FC links
between the data centers. As a
result, S1
(/dev/hpdev/mylink-sde)
becomes accessible from N2
2. Run the following command to
add S1 to md0 on N2
# mdadm --add /dev/md0
/dev/hpdev/mylink-sde
This command initiates the
re-mirroring process from S2 to
S1. When re-mirroring is complete,
the extended distance cluster
detects S1 and accepts it as part of
md0.
Table 4-1 Disaster Scenarios and Their Handling (Continued)