HP LC2000r - NetServer - 128 MB RAM Specifications Page 35

  • Download
  • Add to my manuals
  • Print
  • Page
    / 60
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 34
Data management and audit-
trails
All configuration and result data
along with the MVS files and vali-
dation reports form the "validation
database". Each validation has its
own database. It is stored in a
relational database for full data
integrity and to ensure data secu-
rity. Every validation modification
or configuration change is stored
in the database as a new version
of the existing validation. All
changes and modifications are
documented either in the program
audit-trail (for program related
events such as logon) or in the
validation audit-trail.
35
Result data entry and statisti-
cal calculations
After completion of the analytical
experiments the results can be
uploaded from the ChemStore
database into Method Validation
Pack. The upload from ChemStore
is an active and automated direct
database data access. The transfer
is executed as defined in the plan-
ning of the validation experiments.
The analytical results are con-
tained in the ChemStore database
whereas the validation results are
contained in Method Validation
Pack. Traceability of results is
achieved with unique run-IDs in
ChemStore for each result version.
The ChemStore run-IDs are also
transferred and displayed along
with the analytical results in the
Method Validation Pack.
When all result data is imported,
the validation report can be print-
ed. This report displays all data
related to the validation as defined
in the top-level validation configu-
ration. This includes the compo-
nents, their planning and result
data as well as the calculation
results and conclusions, for exam-
ple, "outliers [not] detected" along
with result representation in
charts.
Page view 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 59 60

Comments to this Manuals

No comments