ENWW Paper feed section 25
HCI disassembly/assembly
12 After installing the up/down wires, make
sure the up/down wires are passed in the
grooves in the pulleys properly and wires
do not run on the sides of the pulleys.
Also make sure the up/down plate can be
moved up and down smoothly by hand.
CAUTION If the up/down plate does
not move up and down
smoothly, reinstall the
up/down wires.
13 Install the up/down wire drive motor
assembly, up/down gear, and relay
connectors, following the removal steps
in reverse.
14 Remove the E-ring to detach the idle
gear.
15 Rotate the remaining paper detection
gear until the round hole in this gear is
aligned with the oblong hole in the
up/down motor mounting assembly.
CAUTION Align when the up/down
plate is in lowest position.
16 Install the idle gear.
17 Attach the covers following the removal
steps in reverse.
CAUTION After replacing the
up/down wires, make
horizontal and centering
adjustment of the up/down
plate. (Refer to
“Adjustment section.”)
Replacing the Q3638A up/down
wires
CAUTION With the power held on,
press the HCI tray down
switch (SW100) to move
the up/down plate down to
the bottom in advance.
Procedure
1 Remove the clutch replacement cover,
side cover (right), front cover, and rear
cover following the steps (1) to (5) in [7]
Replacing the Q3637A up/down Wires.
2 Remove the E-ring.
3 Remove the five screws to detach the
gear cover.
4 Remove the two bearings.
5 Remove the gear A.
6 Remove the E-ring to remove gear B.
Up/down motor
mounting assembly
Remaining paper
detection gear
Idle gear
E-ring
Oblong
hole
Round
hole
Screw
Screw
Screws
Gear cover
Bearing
Bearing
E-ring