Hp ProLiant SL2500 Scalable System User Manual Page 42

  • Download
  • Add to my manuals
  • Print
  • Page
    / 117
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 41
Power capping 42
To remove baseline data from the EEPROM, use the SET POWER BASELINE NONE command. After this
command is used, the only way to re-establish a power baseline is to use the SET POWER BASELINE
command.
If a power cap is currently in place, the SET POWER BASELINE NONE command cannot be used. The power
cap must first be removed (SET POWER CAP NONE), then the baseline can be removed.
If a power cap is currently in place and a SET POWER BASELINE command is issued, then any current
power caps are removed in the calibration. New power caps can be established following the calibration
process, assuming the new baseline data is saved to the EEPROM.
The following text is an example output when an advanced license is installed on all chassis:
> set power baseline
Before running a baseline calibration - ensure that
your configuration has all machines turned on and are
running processes that are typical of the type of workload
you expect them to run in a production environment.
This process will briefly impact the performance of the
servers that are being baseline calibrated as well as
temporarily speed up the fans.
Are you sure you wish to set a new power baseline for this system? (Y/N/Q)
-> Yes
Retrieving license information for chassis Power Manager port 1, Dist. Module
port 1
Verifying..done
Baselining power for servers located in chassis Power Manager port 1, Dist.
Module port 1
Calibrating.................done.
Minimum cap value for this chassis is 777
Maximum cap value for this chassis is 3558
The following text is an example output when an advanced license was not installed on four chassis (1 1, 1
6, 1 7, and 1 10).
> set power baseline
Before running a baseline calibration - ensure that
your configuration has all machines turned on and are
running processes that are typical of the type of workload
you expect them to run in a production environment.
This process will briefly impact the performance of the
servers that are being baseline calibrated as well as
temporarily speed up the fans.
Are you sure you wish to set a new power baseline for this system? (Y/N/Q)
-> Yes
Retrieving license information for chassis Power Manager port 1, Dist. Module
port 1
Verifying..done
One or more servers located in chassis at Power Manager port 1, Dist. Module
port 1 is not licensed for the power capping feature.
This chassis will be skipped for baselining purposes.
Note: All licensed servers should be booted up at least once
so the BIOS/ROM can write the relevant license information
to the chassis controller.
Retrieving license information for chassis Power Manager port 1, Dist. Module
port 2
Verifying..done
Page view 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 116 117

Comments to this Manuals

No comments