Hp ProLiant DL380 G5 Server User Manual Page 56

  • Download
  • Add to my manuals
  • Print
  • Page
    / 114
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 55
Hardware options installation 56
7.
Install the expansion board:
8. Lock the PCI retaining clip.
9. Install the PCI riser cage (on page 26).
10. Connect any required internal or external cables to the expansion board. Refer to the documentation
that ships with the expansion board.
11. Install the access panel (on page 25).
PCI riser board option
To install the component:
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless
all PCI slots have either an expansion slot cover or an expansion board installed.
1. Power down the server (on page 23).
2. Extend the server from the rack (on page 23).
3. Remove the access panel (on page 24).
4. Remove the PCI riser cage (on page 25).
5. Remove any expansion boards.
Page view 55
1 2 ... 51 52 53 54 55 56 57 58 59 60 61 ... 113 114

Comments to this Manuals

No comments