Site requirements 9
Side view clearances shown
End view clearances shown
For additional dimensions, see the HP Site Preparation Drawing Package (on page 22).
Future expansions
When selecting a site location, consider future space and accessibility requirements. Adequate space
around the HP POD 240e NA is necessary for airflow and cooling purposes. Keep the specified areas clear.
For specific space requirements, see the HP POD 240e NA dimensions and required clearances.
Racks
The standard HP installed rack is a 50U rack. The HP POD 240e NA has 22 IT racks per IT section, for a total
of 44 IT racks.
During maintenance, if you remove filler panels for maintenance purposes, you must replace them. Cold-aisle
to hot-aisle separation must be maintained.