Figure 29 Raising a leveler foot
1. Hex nut
2. Leveler foot
3. Carefully move the rack to the installation area and position it to provide the nec essar y service
areas (see Figure 28).
Tostabilizetherackwhenitisinthenal installation loca tion:
1. Use a wrenc
h to lower the foot by turning the leveler foot hex nut clockwise until the caster does
not touch
the oor. Repeat for the other feet.
2. After lowering the feet, check the rack to ensure it is stable and level.
3. Adjust the feet as necessary to ensure the rack is stable and level.
Enterprise Virtual Array 3000/5000 user guide
81