HP Performance Optimized Datacenter (POD) 240a Site Requirements Guide Part Number: 663155-001 October 2011 Edition: 1
Space requirements and clearances 10 End 1 view clearances shown HP POD 240a weight For information on the trucks, deliverables, and the approxima
Space requirements and clearances 11 Truck* Contents Comments Truck weight (lbs) 11 HVAC/DX cradles 3 and 4 Each with 12 HVAC/DX and a catwalk 1
Preparing for delivery and assembly 12 Preparing for delivery and assembly Shipping considerations The HP POD 240a is packaged for shipping such
Preparing for delivery and assembly 13 Temporary lighting and power Proper temporary lighting and power must be installed and maintained in all cons
Environmental considerations 14 Environmental considerations Environmental considerations Avoid placing the HP POD 240a directly along a drainage
Utilities 15 Utilities Proximity to utilities and drains Consider proximity to required utilities, such as power, water, and network connections. Whi
Utilities 16 Water quality Water must be maintained per the following acceptable water quality standards. Requirement Specification Type of water in
Utilities 17 Power IMPORTANT: To provide power to the HP POD 240a, external transformers and switchboards may be required. This equipment mu
Utilities 18 Transformers and switchboards The input power for the Critical IT Loads requires a source of 380-415V, 3phase Wye power. This may requir
Required facility connections 19 Required facility connections Connections to central facility infrastructure The HP POD 240a is designed to functio
© Copyright 2011 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warrantie
Required facility connections 20 End view shown Connection portal diameter Connection point Quantity per IT section Total quantity per HP POD 240
Required facility connections 21 The HP POD 240a structural sections, metal raceways, wireways, conduit, boxes, and other external intersystem co
Required facility connections 22 End view shown Item Component 1 Grounding electrode conductor connection
Supported facility connections 23 Supported facility connections Humidifier A dedicated water supply and approved drainage is required for the humid
Supported facility connections 24 HP POD 240a security The HP POD 240a is equipped with standard key lock hardware at each personnel entry door and
Glossary 25 Glossary AHJ Authority Having Jurisdiction door A hinged portion of an enclosure that covers an opening. DX direct expansion ECS envir
Glossary 26 listed Equipment, materials, or services included in a list published by an organization that is acceptable to the authority having juris
Contents 3 Contents Overview ...
Contents 4 Fire, safety, and security notifications ...
Overview 5 Overview About this document This document outlines the site requirements for an HP Performance Optimized Datacenter (POD) 240a. The custo
Site requirements 6 Site requirements HP Site Preparation Drawing Package HP provides detailed schematic engineer drawings of the HP POD 240a in the
Site requirements 7 Operational clearance around the HP POD 240a Power (on page 17) Water supply (on page 15) Drainage (on page 16) S
Space requirements and clearances 8 Space requirements and clearances HP POD 240a dimensions and required clearances NOTE: Shaded areas indicat
Space requirements and clearances 9 End 2 view clearances shown Side view clearances shown