HP 9000 rp7440 Installation Guide Page 50

  • Download
  • Add to my manuals
  • Print
  • Page
    / 101
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 49
Chapter 2
Installing the Server
Lifting the Server Cabinet Manually
50
Step 6. Align the screw holes in the handle’s front flange with the rack mounting holes in the server’s rack
mount flange. Secure with the two thumbscrews. See Figure 2-6 on page 50.
Figure 2-6 Attaching the Front of Handle to Chassis
Step 7. Repeat steps 2—4 to install the other handle on the other side of the server.
Step 8. After handles are secured, server is ready to lift.
Step 9. Handles are removed in reverse order of steps 2—4.
Step 10. After moving the server, remove the lift handles from the chassis.
Step 11. After the server is secured, replace the previously removed cell boards and bulk power supplies.
Step 12. Reinstall the side covers and front bezel.
Thumbscrews
Page view 49
1 2 ... 45 46 47 48 49 50 51 52 53 54 55 ... 100 101

Comments to this Manuals

No comments