Hp ProLiant ML370 G6 Server User Manual Page 77

  • Download
  • Add to my manuals
  • Print
  • Page
    / 172
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 76
Hardware options installation 77
9.
Slide the optical drive into the drive bay.
10. Route and connect the cables:
a. Connect the power and data cable to the optical drive.
b. Connect the power cable to an available system power cable.
c. Route and connect the data cable to the system board.
11. Install the fan cage.
12. Install the air baffle.
13. If removed, install the BBWC battery pack or the FBWC capacitor pack ("Installing the BBWC battery
pack or the FBWC capacitor pack" on page 86).
14. Install fan 5.
15. Install the access panel.
16. Do one of the following:
o Close or install the tower bezel, as needed.
o Slide the server back into the rack.
Page view 76
1 2 ... 72 73 74 75 76 77 78 79 80 81 82 ... 171 172

Comments to this Manuals

No comments