HP 20cp User's Guide

Browse online or download User's Guide for Dehumidifiers HP 20cp. HP 20cp Reference Guide User Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - America

HP Performance Optimized Datacenter 20c Site Preparation and Requirements Guide—North America Abstract This document provides site preparation guida

Page 2

Site requirements 10 Side view clearances shown Top view for multiple POD installation minimum clearances shown Adequate space around the HP POD 2

Page 3 - Contents

Site requirements 11 Grounding requirements The HP POD 20c structure and internal components are all bonded together. A common grounding electrode c

Page 4 - Contents 4

Site requirements 12 Utilities Consider the proximity to required utilities, such as power, water, and network connections. While the required utili

Page 5 - Overview

Site requirements 13 Requirement Location Specification Humidifier drain Cold aisle side (1) 3.18 cm (1.25 in) drain line and 26.5 lpm (7 gpm) ma

Page 6 - Site safety and security

Site requirements 14 Feature Specification Facility input temperature to the HP POD 20c 12º to 24ºC (55º to 75ºF) Max design pressure 1,034 kPa (1

Page 7 - HP POD 20c capacities

Site requirements 15 These actions must be performed for all associated parts of the electrical power train. The majority of the details and factors

Page 8 - Site requirements

Supported facility connections 16 Supported facility connections Environmental control system The ECS developed for the HP water-cooled POD is a sta

Page 9 - End 1 view clearances shown

Supported facility connections 17 End view shown Humidifier A dedicated water supply and approved drainage is required for the humidifier. For mor

Page 10 - Future expansions

Supported facility connections 18 HP POD 20c access control The HP POD 20c is equipped with standard key lock hardware for each personnel entry door

Page 11 - Grounding requirements

Supported facility connections 19 Front view shown You must make the connections between the facility and the HP POD 20c. For configuration and ins

Page 12 - Utilities

© Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warranties

Page 13 - Chilled water supply

Environmental considerations 20 Environmental considerations Environmental risks • Avoid placing the HP POD 20c directly along a drainage path or i

Page 14 - Site electrical system

Site plan requirements and actions 21 Site plan requirements and actions Completing a site assessment HP requires a detailed site assessment prior t

Page 15 - Site requirements 15

Site plan requirements and actions 22 • Ensure that the site safety and security programs are properly administered. • Interface directly with the

Page 16 - Environmental control system

Site plan requirements and actions 23 • Assembly equipment locations Item Description 1 Crane 2 Reach 3 Truck 4 Area clear for scissors lift and

Page 17 - Humidifier

Site plan requirements and actions 24 Additional structures If a customer-provided vestibule or other structure is installed and connected to the HP

Page 18 - Demarcation box

Appendix A: HP site assessment 25 Appendix A: HP site assessment HP POD 20c site assessment checklist During a survey of the readiness of a proposed

Page 19 - Front view shown

Appendix A: HP site assessment 26 Item Description Yes No N/A Initial 8. Clearances Inspect the proposed installation site to confirm clearance

Page 20 - Environmental considerations

Appendix A: HP site assessment 27 Item Description Yes No N/A Initial 15. Recommendations Following the HP installation site visit, analyze the

Page 21 - Project coordination

Appendix B: Preparing for delivery 28 Appendix B: Preparing for delivery Pre-delivery tasks Allow adequate time for planning, scheduling, obtaining

Page 22 - Site planning

Appendix B: Preparing for delivery 29 Item Description Initial 10 Verify that the site location has clearances for the HP POD 20c installation, in

Page 23

Contents 3 Contents Overview ...

Page 24 - Additional structures

Appendix B: Preparing for delivery 30 Item Description Initial 2 Verify that the chilled water supply temperature meets the minimum POD chilled wa

Page 25

Appendix C: Regulatory compliance notices 31 Appendix C: Regulatory compliance notices HP POD 20c regulatory compliance The HP POD 20c complies with

Page 26

Appendix C: Regulatory compliance notices 32 • The HP POD 20c is designed for stationary installation outdoors in a Pollution Degree 3 environment,

Page 27 - Item Description Initial

Glossary 33 Glossary AHJ authority having jurisdiction APJ Asia Pacific Japan BMS building management system door A hinged portion of an enclosur

Page 28 - Pre-delivery tasks

Glossary 34 listed Equipment, materials, or services included in a list published by an organization that is acceptable to the authority having juri

Page 29 - Chilled Water Supply

Documentation feedback 35 Documentation feedback HP is committed to providing documentation that meets your needs. To help us improve the documentat

Page 30 - General

Index 36 A about this guide 5 areas prone to lightning or power surges 20 assembly 28 assembly area 22 C capacity limitations 7 clearance

Page 31 - Safety and NEC compliance

Index 37 site planning considerations 22 site preparation 6 site preparation checklist 28 site requirements 8, 21 storage locations 23 sup

Page 32 - Warranty information

Contents 4 Project coordination ...

Page 33 - Glossary

Overview 5 Overview About this document This document outlines the site and preparation requirements for a 6 m (20 ft) HP POD 20c as it is being rel

Page 34 - Glossary 34

Overview 6 Feature Specification Class Class1 Ambient temperature 2°C to 54°C (35.6°F to 129.2°F) Relative humidity 0% to 100% humidity • As part

Page 35 - Documentation feedback

HP POD 20c capacities 7 HP POD 20c capacities HP POD 20c capacity limitations The capacity limitations for the HP POD 20c are separated into two cat

Page 36 - Index 36

Site requirements 8 Site requirements Site pad The structural design of the HP POD 20c site pad must be based on the specific weight load of the com

Page 37 - Index 37

Site requirements 9 End 1 view clearances shown Top view keep-out and door swing clearances shown (shaded areas indicate the required clearance)

Comments to this Manuals

No comments