HP Performance Optimized Datacenter 20c Site Preparation and Requirements Guide—International Abstract This document provides site preparation guida
Site requirements 10 Side view clearances shown Top view for multiple POD installation minimum clearances shown Adequate space around the HP POD 2
Site requirements 11 Grounding requirements The HP POD 20c structure and internal components are all bonded together. A common grounding electrode c
Site requirements 12 Front view shown Utilities Consider the proximity to required utilities, such as power, water, and network connections. While
Site requirements 13 • Do not treat the water with softeners. Softeners can produce foam, which affects the operation of the unit. • Do not use we
Site requirements 14 Parameter Range Calcium hardness (CaCO3) 0–200 ppm Magnesium hardness (CaCO3) 0–150 ppm Copper (Cu) < 0.20 ppm Iron (Fe) &l
Site requirements 15 • Distance between possible UPS or generator locations and the HP POD 20c • Requirements for routing electrical feeders (unde
Supported facility connections 16 Supported facility connections Environmental control system The ECS developed for the HP water-cooled POD is a sta
Supported facility connections 17 End view shown Humidifier A dedicated water supply and approved drainage is required for the humidifier. For mor
Supported facility connections 18 HP POD 20c access control The HP POD 20c is equipped with standard key lock hardware for each personnel entry door
Supported facility connections 19 Front view shown You must make the connections between the facility and the HP POD 20c. For configuration and ins
© Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warranties
Supported facility connections 20 You must make the connections between the facility and the HP POD 20c. For configuration and installation instruct
Environmental considerations 21 Environmental considerations Environmental risks • Avoid placing the HP POD 20c directly along a drainage path or i
Site plan requirements and actions 22 Site plan requirements and actions Completing a site assessment HP requires a detailed site assessment prior t
Site plan requirements and actions 23 • Ensure that the site safety and security programs are properly administered. • Interface directly with the
Site plan requirements and actions 24 • Assembly equipment locations Item Description 1 Crane 2 Reach 3 Truck 4 Area clear for scissors lift and
Site plan requirements and actions 25 Additional structures If a customer-provided vestibule or other structure is installed and connected to the HP
Appendix A: HP site assessment 26 Appendix A: HP site assessment HP POD 20c site assessment checklist During a survey of the readiness of a proposed
Appendix A: HP site assessment 27 Item Description Yes No N/A Initial 8. Clearances Inspect the proposed installation site to confirm clearance
Appendix A: HP site assessment 28 Item Description Yes No N/A Initial 15. Recommendations Following the HP installation site visit, analyze the
Appendix B: Preparing for delivery 29 Appendix B: Preparing for delivery Pre-delivery tasks Allow adequate time for planning, scheduling, obtaining
Contents 3 Contents Overview ...
Appendix B: Preparing for delivery 30 Item Description Initial 10 Verify that the site location has clearances for the HP POD 20c installation, in
Appendix B: Preparing for delivery 31 Item Description Initial 2 Verify that the chilled water supply temperature meets the minimum POD chilled wa
Appendix C: Regulatory compliance notices 32 Appendix C: Regulatory compliance notices HP POD 20c regulatory compliance The HP POD 20c complies with
Appendix C: Regulatory compliance notices 33 Feature Specification Class Class1 Ambient temperature 2°C to 54°C (35.6°F to 129.2°F) Relative humidi
Glossary 34 Glossary APJ Asia Pacific Japan BMS building management system door A hinged portion of an enclosure that covers an opening. ECS envi
Glossary 35 inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing states that either the e
Documentation feedback 36 Documentation feedback HP is committed to providing documentation that meets your needs. To help us improve the documentat
Index 37 A about this guide 5 areas prone to lightning or power surges 21 assembly 29 assembly area 23 C capacity limitations 7 clearance
Index 38 site planning considerations 23 site preparation 6 site preparation checklist 29 site requirements 8, 22 storage locations 24 sup
Contents 4 Zoning and permit requirements ...
Overview 5 Overview About this document This document outlines the site and preparation requirements for a 6 m (20 ft) HP POD 20c as it is being rel
Overview 6 Feature Specification Class Class1 Ambient temperature 2°C to 54°C (35.6°F to 129.2°F) Relative humidity 0% to 100% humidity • As part
HP POD 20c capacities 7 HP POD 20c capacities HP POD 20c capacity limitations The capacity limitations for the HP POD 20c are separated into two cat
Site requirements 8 Site requirements Site pad The structural design of the HP POD 20c site pad must be based on the specific weight load of the com
Site requirements 9 End 1 view clearances shown Top view keep-out and door swing clearances shown (shaded areas indicate the required clearance)